Monday, October 10, 2022

Herbs too

 10th August 2021, Herbs Too


The construction work continues. As you can see the final pallet has now been installed. We now have a terrace albeit with gaps. The terrace length is a full 3.2m. The other part of the dry wall is now also constructed. And the space occupied by the white pot has been left for the potential of a small pond in due course. 


We have also planted some herbs into the space this side of the trellis close to the passiflora. They are four types of mint (that's how many Desi bought online for now) also some oregano and chives.


Next steps for the terrace is the raised bed wall so that we can populate with soil, finish off with the decking so that we can sit more comfortably and then a table and bench seat to create.





December 2023

  2nd December 2022 - The festive month has arrived and it is now officially wet all the time The long wait for the holiday season is over, ...