14th November 2022 - Getting Ready for the Manure
Levelling off the soil now ready for the manure delivery in about a week’s time.
Notice the wooden panelling on the side wall of the terrace has a slight pink hue to it. This wood has been selected because it is much harder wood than the regular brown / pale softer wood. As these panels are likely to be under the soil Chris has selected the best of what we had for this purpose.