Saturday, January 14, 2023

Getting Ready for the Manure

 14th November 2022 - Getting Ready for the Manure


Levelling off the soil now ready for the manure delivery in about a week’s time.


Notice the wooden panelling on the side wall of the terrace has a slight pink hue to it. This wood has been selected because it is much harder wood than the regular brown / pale softer wood. As these panels are likely to be under the soil Chris has selected the best of what we had for this purpose.



Once this soil is levelled, we can begin to focus on the other side and ready this for the work in spring when the cold frame will need digging as will the path the far side of the terrace. Still plenty of construction and groundworks to be done, but we’ve done most of the hard work now.




December 2023

  2nd December 2022 - The festive month has arrived and it is now officially wet all the time The long wait for the holiday season is over, ...